TEPCO: Press releases


Mar 11, 2010 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of March 11)
Mar 4, 2010 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of March 4)
Feb 25, 2010 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of February 25)
Feb 18, 2010 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of February 18)
Feb 12, 2010 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of February 12)
Feb 4, 2010 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of February 4)
Jan 28, 2010 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of January 28)
Jan 21, 2010 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of January 21)
Jan 14, 2010 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of January 14)
Jan 7, 2010 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of January 7)
Dec 28, 2009 Resuming Commercial Operation of the Kashiwazaki-Kariwa Nuclear Power Station Unit 7 after the Niigata-Chuetsu-Oki Earthquake
Dec 24, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of December 24)
Dec 17, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of December 17)
Dec 10, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of December 10)
Dec 3, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of December 3)
Nov 26, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of November 26)
Nov 19, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of November 19)
Nov 12, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of November 12)
Nov 10, 2009 Resuming Generation of the Kashiwazaki-Kariwa Nuclear Power Station Unit No. 7
Nov 5, 2009 Restart of Kashiwazaki-Kariwa Nuclear Power Station Unit No.7 after Refueling
Nov 5, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of November 5)
Oct 29, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of October 29)
Oct 22, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of October 22)
Oct 15, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of October 15)
Oct 8, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of October 8)
Oct 1, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of October 1)
Sep 28, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.6 after the Niigata-Chuetsu-Oki Earthquake (Final evaluation of functional tests for the entire plant)
Sep 25, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of September 25)
Sep 24, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.6 after the Niigata-Chuetsu-Oki Earthquake (Evaluation results after system functional tests)
Sep 17, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of September 17)
Sep 14, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.6 after the Niigata-Chuetsu-Oki Earthquake (Evaluation results after reaching rated thermal output)
Sep 10, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.6 after the Niigata-Chuetsu-Oki Earthquake (Evaluation results at 100% rated electric output)
Sep 10, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of September 10)
Sep 6, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.6 after the Niigata-Chuetsu-Oki Earthquake (Evaluation of the plant status when generating power at approx. 75% of the rated output)
Sep 4, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.6 after the Niigata-Chuetsu-Oki Earthquake (Evaluation of the plant status when generating power at approx. 50% of the rated output)
Sep 3, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of September 3)
Sep 2, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.6 after the Niigata-Chuetsu-Oki Earthquake (Evaluation of the plant status when generating power at approx. 20% of the rated output)
Aug 31, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.6 after the Niigata-Chuetsu-Oki Earthquake (Starting generation)
Aug 28, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.6 after the Niigata-Chuetsu-Oki Earthquake (Evaluation After Raising the Reactor Pressure to Approx. 3.5MPa)
Aug 27, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of August 27)
Aug 26, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.6 after the Niigata-Chuetsu-Oki Earthquake (Restarting the Nuclear Reactor)
Aug 25, 2009 Start of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.6 after the Niigata-Chuetsu-Oki Earthquake
Aug 20, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of August 20)
Aug 6, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of August 6)
Jul 30, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of July 30)
Jul 23, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of July 23)
Jul 16, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of July 16)
Jul 9, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of July 9)
Jul 2, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of July 2)
Jun 25, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of June 25th)
Jun 19, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.7 after the Niigata-Chuetsu-Oki Earthquake(Final evaluation of functional tests for the entire plant)
Jun 18, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of June 18th)
Jun 11, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.7 after the Niigata-Chuetsu-Oki Earthquake (Evaluation results after system functional tests)
Jun 11, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of June 11th)
Jun 8, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.7 after the Niigata-Chuetsu-Oki Earthquake (Evaluation results after reaching rated thermal output)
Jun 5, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.7 after the Niigata-Chuetsu-Oki Earthquake (Evaluation results at 100% rated electric output)
Jun 4, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of June 4th)
Jun 2, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.7 after the Niigata-Chuetsu-Oki Earthquake (Raising generating power to approx. 100% of the rated output)
Jun 2, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.7 after the Niigata-Chuetsu-Oki Earthquake (Evaluation of the plant status when generating power at approx. 75% of the rated output)
May 29, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.7 after the Niigata-Chuetsu-Oki Earthquake (Evaluation of the plant status when generating power at approx. 50% of the rated output)
May 28, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of May 28th)
May 23, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.7 after the Niigata-Chuetsu-Oki Earthquake (Evaluation of the plant status when generating power at approx. 20% of the rated output)
May 21, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of May 21st)
May 20, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.7 after the Niigata-Chuetsu-Oki Earthquake (Starting generation)
May 19, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.7 after the Niigata-Chuetsu-Oki Earthquake (Starting generation by temporary main generator synchronization)
May 14, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of May 14th)
May 11, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.7 after the Niigata-Chuetsu-Oki Earthquake(Evaluation After Raising the Reactor Pressure to Approx. 3.5MPa)
May 9, 2009 Performing a Series of Functional Tests for the Entire Plant of the Kashiwazaki-Kariwa Nuclear Power Station Unit No.7 after the Niigata-Chuetsu-Oki Earthquake(Restarting the Nuclear Reactor)
May 8, 2009 Approval of Restarting the Kashiwazaki-Kariwa Nuclear Power Station Unit No.7
Apr 30, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of April 30th)
Apr 23, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of April 23rd)
Apr 16, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of April 16th)
Apr 9, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of April 9th)
Apr 2, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of April 2nd)
Mar 26, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of March 26th)
Mar 19, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of March 19th)
Mar 12, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of March 12th)
Mar 5, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of March 5th)
Feb 26, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of February 26th)
Feb 19, 2009 Asking Restart of Unit No. 7 of the Kashiwazaki-Kariwa Nuclear Power Station
Feb 19, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of February 19th)
Feb 12, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of February 12th)
Feb 5, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of February 5th)
Jan 29, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of January 29th)
Jan 22, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of January 22nd)
Jan 15, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of January 15th)
Jan 8, 2009 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of January 8th)
Dec 25, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of December 25th)
Dec 18, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of December 18th)
Dec 11, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of December 11th)
Dec 4, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of December 4th)
Nov 27, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of November 27th)
Nov 20, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of November 20th)
Nov 13, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of November 13th)
Nov 6, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of November 6th)
Oct 30, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of October 30th)
Oct 23, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of October 23rd)
Oct 22, 2008 Submission of the Report on the Geology and Tectonics of Areas Adjoining the Kashiwazaki-Kariwa NPS and the Supplementary Report on the Design-Basis Seismic Motion
Oct 16, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of October 16th)
Oct 9, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of October 9th)
Oct 2, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of October 2nd)
Sep 25, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of September 25th)
Sep 18, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of September 18th)
Sep 11, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of September 11th)
Sep 4, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of September 4th)
Aug 28, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of August 28th)
Aug 21, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of August 21st)
Aug 7, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of August 7th)
Jul 31, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of July 31st)
Jul 24, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of July 24th)
Jul 17, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of July 17th)
Jul 10, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of July 10th)
Jul 3, 2008 Status of the Inspection and Restoration Works Performedafter the Niigata-Chuetsu-Oki Earthquake (as of July 3rd)
Jun 26, 2008 Status of the Inspection and Restoration Works Performedafter the Niigata-Chuetsu-Oki Earthquake (as of June 26th)
Jun 19, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of June 19th)
Jun 12, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of June 12th)
Jun 5, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of June 5th)
May 29, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of May 29th)
May 22, 2008 Analysis of Seismic Observation Data Acquired at the Time of the 2007 Niigata-Chuetsu-Oki Earthquake at the Kashiwazaki-Kariwa Nuclear Power Station, and the Submission of the Report Concerning the Design-basis Seismic Motion
May 22, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of May 22nd)
May 15, 2008 Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of May 15th)
May 8, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (May 8th)
Apr 24, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (April 24th)
Apr 17, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (April 17th)
Apr 10, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (April 10th)
Apr 3, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (April 3rd)
Mar 27, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (March 27th)
Mar 19, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (March 19th)
Mar 13, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (March 13th)
Mar 06, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (March 6th)
Feb 28, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (February 28th)
Feb 21, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (February 21st)
Feb 14, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (February 14th)
Feb 07, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (February 7th)
Jan 31, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (January 31st)
Jan 24, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (January 24th)
Jan 17, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (January 17th)
Jan 10, 2008 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (January 10th)
Dec 27, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (December 27th)
Dec 20, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (December 20th)
Dec 13, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (December 13th)
Dec 6, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (December 6th)
Dec 6, 2007 Status of the unit 7 turbine internal inspections at Kashiwazaki-Kariwa Nuclear Power Station
Dec 3, 2007 Status of the Unit 5 in-core inspections at the Kashiwazaki-Kariwa Nuclear Power Station
Nov 29, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (November 29th)
Nov 29, 2007 Status of the Unit 5 in-core inspections (Phase 1&2) at the Kashiwazaki-Kariwa Nuclear Power Station
Nov 29, 2007 Status of the Unit 7 turbine internal inspections at the Kashiwazaki-Kariwa Nuclear Power Station
Nov 29, 2007 Status of the Unit 3 turbine internal inspections at the Kashiwazaki-Kariwa Nuclear Power Station
Nov 27, 2007 Implementation of Geological and Ground Surveys at the Fukushima Daiichi Nuclear Power Station and the Daini Nuclear Power Station following the Niigata-Chuetsu-Oki Earthquake (Part II)
Nov 27, 2007 Status of the Unit 6 reactor in-core inspections
Nov 25, 2007 Status of the Unit 6 reactor in-core inspections
Nov 22, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (November 22nd)
Nov 20, 2007 Status of the unit 4 turbine internal inspections at Kashiwazaki-Kariwa Nuclear Power Station
Nov 20, 2007 Status of the unit 5 in-core inspections at Kashiwazaki-Kariwa Nuclear Power Station
Nov 16, 2007 Forecast of Demand and Supply for This Winter
Nov 15, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (November 15th)
Nov 14, 2007 Misalignment of a fuel assembly and its fuel support at the Unit 5 at Kashiwazaki-Kariwa Nuclear Power Station
Nov 14, 2007 International Nuclear Event Scale (INES) on Incidents at the Kashiwazaki-Kariwa Nuclear Power Station after the Niigata-Chuetsu-Oki Earthquake
Nov 12, 2007 Status of the unit 5 in-core inspections at Kashiwazaki-Kariwa Nuclear Power Station
Nov 8, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (November 8th)
Nov 5, 2007 Implementation of Geological and Ground Surveys at the Fukushima Daiichi and Daini Nuclear Power Stations following the Niigata-Chuetsu-Oki Earthquake
Nov 1, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (November 1st)
Oct 25, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (October 25th)
Oct 23, 2007 (Follow-up summary) Water leakage at the Unit No.7 reactor building (controlled area) of Kashiwazaki-Kariwa Nuclear Power Station.
Oct 21, 2007 Water leakage at the Unit No.7 reactor building (controlled area) of Kashiwazaki-Kariwa Nuclear Power Station.
Oct 18, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (October 18th)
Oct 18, 2007 Status of the Unit 7 in-core inspections
Oct 15, 2007 Establishment of the "Niigata-Chuetsu-Oki Earthquake Restoration Management Center" and Strengthening of the Disaster Preparedness System for Nuclear Power Plants
Oct 11, 2007 Submission of the "Report on Failures and Other Troubles in Reactor Facilities" Associated with the Niigata-Chuetsu-Oki Earthquake in Kashiwazaki-Kariwa Nuclear Power Station
Oct 11, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (October 11th)
Oct 09, 2007 Detection of drain water from the well liners at Kashiwazaki-Kariwa Nuclear Power Station Unit No.7
Oct 04, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (October 4th)
Oct 01, 2007 Results of the Unit No. 1 in-core inspection at the Kashiwazaki-Kariwa Nuclear Power Station
(Phase 2)
Sep 27, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (September 27th)
Sep 20, 2007 Results of a general study of potential seismic impact on safety-significant equipment in the Fukushima-Daiichi Nuclear Power Station and the Fukushima-Daini Nuclear Power Station in light of the Niigata-Chuetsu-oki Earthquake in 2007
Sep 20, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (September 20th)
Sep 14, 2007 Supply and Demand of Power for This Summer in TEPCO
Sep 13, 2007 Geological Survey (in Land Area) Made at the Kashiwazaki Kariwa Nuclear Power Station after the Occurrence of Niigata-Chuetsu-Oki Earthquake
Sep 13, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (September 13th)
Sep 10, 2007 Forecast of Electric Demand and Supply ( eighth report )
Sep 6, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (September 6th)
Sep 3, 2007 Forecast of Electric Demand and Supply ( seventh report )
Aug 27, 2007 Forecast of Electric Demand and Supply ( sixth report )
Aug 23, 2007 Nonconformances Found in the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (Weekly Report: August 17 to 22, 2007)
Aug 23, 2007 Investigation Results on the Causes of the Fire on House Transformer 3B at Kashiwazaki-Kariwa Nuclear Power Station Resulting from the Niigata-Chuetsu-Oki Earthquake
Aug 22, 2007 The result of generating at the Shiobara Power Station
Aug 22, 2007 Today's Electric Demand and Supply (5:30pm)
Aug 22, 2007 Beginning of generation of The Shiobara Power Station for Urgent and Temporary Use and Asking Our Customers for More Electricity Conservation
Aug 22, 2007 Demand Reduction Based on Load Management Contracts and Call for More Energy Conservation
Aug 21, 2007 Withholding of the Urgent and Temporary Use of The Shiobara Power Station
Aug 20, 2007 Water Pumping of The Shiobara Power Station for Urgent and Temporary Useand Asking Our Customers for More Electricity Conservation
Aug 20, 2007 Forecast of Electric Demand and Supply ( fifth report )
Aug 17, 2007 Geological surveys planned at our nuclear power stations following Niigata Chuetsu Oki Earthquake
Aug 13, 2007 Forecast of Electric Demand and Supply ( fourth report )
Aug 10, 2007 Plant Status of Kashiwazaki-Kariwa Nuclear Power Station as of August 10th at 14:00
Aug 06, 2007 Forecast of Electric Demand and Supply ( third report )
Aug 03, 2007 Plant Status of Kashiwazaki-Kariwa Nuclear Power Station as of August 3rd at 14:00
Aug 02, 2007 Status of Nonconformance Management Related to the 2007 Niigata-Chuetsu-Oki Earthquake
Jul 30, 2007 The (First) Report on the Analysis of Observed Seismic Data Collected in Kashiwazaki-Kariwa Nuclear Power Station on the Occasion of the Niigata-Chuetsu-Oki Earthquake in 2007
Jul 30, 2007 Forecast of Electric Demand and Supply (follow up)
Jul 30, 2007 Reception of Permission for the Emergency and Temporary Use of the Shiobara Power Station Issued by the Ministry of Land, Infrastructure and Transport under Article 23 of the River Law
Jul 27, 2007 Plant Status of Kashiwazaki-Kariwa Nuclear Power Station as of July 27th at 3PM
Jul 26, 2007 On Submission of the "Improvement Program for the Enhancement of the In-House Firefighting System and for the Establishment of a Rapid and Accurate Accident Reporting System in Light of the 2007 Niigata-Chuetsu-Oki Earthquake"
Jul 26, 2007 Submission of an Application for the Emergency and Temporary Use of the TEPCO Shiobara Power Station to the Ministry of Land, Infrastructure and Transport
Jul 26, 2007 Performance of the Geological Survey in the Sea Adjacent to the Kashiwazaki-Kariwa Nuclear Power Station in Light of the Niigata-Chuetsu-Oki Earthquake
Jul 24, 2007 Measurement Results as of July 23rd on the Release of Radioactive Materials from the Main Exhaust Stack of Kashiwazaki-Kariwa Nuclear Power Station Unit 7 (Currently Shut Down)
Jul 24, 2007 Plant Status of Kashiwazaki-Kariwa Nuclear Power Station as of July 24th
Jul 20, 2007 Forecast of Electric Demand and Supply
Jul 20, 2007 (Summary) A Report on Safety Security of Kashiwazaki-Kariwa Nuclear Power Station after the Niigata-Chuetsu-Oki Earthquake
Jul 19, 2007 Observation Record of the Seismic Activity at the Kashiwazaki-Kariwa Nuclear Power Station during the Niigata-Chuetsu-Oki Earthquake
Jul 19, 2007 Plant Status of Kashiwazaki-Kariwa Nuclear Power Station as of July 19th
back to page top