TEPCO: State of the power station after the 2007 Niigata-Chuetsu-Oki Earthquake /Explanations of the major events
State of the Power Station: Top Page
Explanations of the major events : Top Page
Explanations of the major events : Top Page
< Explanations of the major events >
∼ events related to radioactive materials ∼
Displacement of the ducts connected to the main exhaust stack (units 1 to 5).
Water puddle on the reactor building refueling floor.
Water inflow from the outdoor fire protection system piping into the unit 1 reactor combination building.
Leakage of water containing a trace of radioactivity into the sea via the non-controlled area of unit 6.
Iodine and radioactive particulate materials were detected at the main exhaust stack of unit 7.
∼ events not related to radioactive materials ∼
Fire at the unit 3 house transformer.
Drums tipped over in the solid waste storehouse.
Breakage on the coupling of the drive axis of the unit 6 reactor building ceiling crane.
Insulating oil leakage from transformers, etc.
|
State of the Power Station after the 2007 Niigata-Chuetsu-Oki Earthquake
|
|