(Feb 29,2012)Status of exposure dose evaluation for the workers at Fukushima Daiichi Nuclear Power Station
(Feb 29,2012)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station(36th Release)
(Feb 29,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 29)
(Feb 29,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 29)
(Feb 29,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 29, 2012)
(Feb 29,2012)Report to Nuclear and Industrial Safety Agency (NISA) of Ministry of Economy, Trade and Industry (METI) regarding the items to be reflected in the seismic safety analysis of the nuclear power plants, etc. (Interim Report) based on the knowledge of ground motion obtained from Tohoku-Chihou-Taiheiyou-Oki Earthquake in 2011
(Feb 29,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 29)
(Feb 29,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 29)
(Feb 28,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 28)
(Feb 28,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 28)
(Feb 28,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 28, 2012)
(Feb 28,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 28)
(Feb 28,2012)Regarding start of reparation payouts for losses due to Voluntary Evacuation
(Feb 28,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 28)
(Feb 28,2012)Start of inviting proposals for the specification of smart meters
(Feb 27,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 27)
(Feb 27,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 27)
(Feb 27,2012)Received the directive from NISA regarding isolation condenser In Establishment Permit Application of Unit 1 at Fukushima Daiichi Nuclear Power Station
(Feb 27,2012)Fuel Cost Adjustment in Electricity Fees for April 2012
(Feb 27,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 27, 2012)
(Feb 27,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 27)
(Feb 27,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 27)
(Feb 26,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 26)
(Feb 26,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 26)
(Feb 26,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 26, 2012)
(Feb 26,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 26)
(Feb 26,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 26)
(Feb 25,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 25, 2012)
(Feb 25,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 25)
(Feb 25,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 25)
(Feb 25,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 11:30 am, February 25)
(Feb 25,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 11:30 am, February 25)
(Feb 25,2012)Receipt of an instruction document on correspondence for temperature increase in the lower part of the Reactor Pressure Vessel of Unit 2 at TEPCO Fukushima Daiichi Nuclear Power Station
(Feb 24,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 24, 2012)
(Feb 24,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 24)
(Feb 24,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 24)
(Feb 24,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 24)
(Feb 24,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 24)
(Feb 23,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 23)
(Feb 23,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 23)
(Feb 23,2012)Operational Change of Wearing Protective Equipment at the Site of Fukushima Daiichi Nuclear Power Station
(Feb 23,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 23, 2012)
(Feb 23,2012)Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of February 23)
(Feb 23,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 23)
(Feb 23,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 23)
(Feb 22,2012)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station(35th Release)
(Feb 22,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 22)
(Feb 22,2012)Shutdown of the Stage 2 of the Group 4 of Futtsu Thermal Power Plant
(Feb 22,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 22)
(Feb 22,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 22)
(Feb 22,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 22, 2012)
(Feb 22,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 22)
(Feb 21,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 21)
(Feb 21,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 21)
(Feb 21,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 21, 2012)
(Feb 21,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 21)
(Feb 21,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 21)
(Feb 20,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 20)
(Feb 20,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 20)
(Feb 20,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 20, 2012)
(Feb 20,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 20)
(Feb 20,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 20)
(Feb 19,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 19)
(Feb 19,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 19)
(Feb 19,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 19, 2012)
(Feb 19,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 11:00 am, February 19)
(Feb 19,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 11:00 am, February 19)
(Feb 18,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 18)
(Feb 18,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 18)
(Feb 18,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 18, 2012)
(Feb 18,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 18)
(Feb 18,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 18)
(Feb 17,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 17)
(Feb 17,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 17)
(Feb 17,2012)Operation of the water injection amount based on a series of temperature increasing of the lower part of the Reactor Pressure Vessel of Unit 2 at Fukushima Daiichi Nuclear Power Station
(Feb 17,2012)Report to Nuclear and Industrial Safety Agency of Ministry of Economy, Trade and Industry (NISA) in response to the additional instruction on anti-earthquake countermeasures to switchyards etc. to secure the reliability of offsite power supply to nuclear power stations etc.
(Feb 17,2012)Submission of a report on investigation of causes of damage situation of power facilities inside and outside of Fukushima Daiichi Nuclear Power Station to NISA (2nd release)
(Feb 17,2012)The submission of the report to Nuclear and Industrial Safety Agency of Ministry of Economy, Trade and Industry (NISA) on the safety evaluation of transmission tower foundations regarding the offsite power supply to nuclear power stations and reprocessing plants
(Feb 17,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 17, 2012)
(Feb 17,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 17)
(Feb 17,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 17)
(Feb 16,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 16)
(Feb 16,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 16)
(Feb 16,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 16, 2012)
(Feb 16,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 16)
(Feb 16,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 16)
(Feb 16,2012)Recruitment for 2013
(Feb 16,2012)Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of February 16)
(Feb 16,2012)Area Eligible for Compensation to be expanded for Tourist Businesses Affected by Harmful Rumors
(Feb 16,2012)Submission of a report on the correspondence for temperature increase in the lower part of the Reactor Pressure Vessel of Unit 2 at TEPCO Fukushima Daiichi Nuclear Power Station to NISA
(Feb 15,2012)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station(34th Release)
(Feb 15,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 15)
(Feb 15,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 15, 2012)
(Feb 15,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 15)
(Feb 15,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 15)
(Feb 15,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 15)
(Feb 15,2012)TEPCO Concludes Communication Protocol Agreement with Nagano Prefecture
(Feb 14,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 14)
(Feb 14,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 14)
(Feb 14,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 14, 2012)
(Feb 14,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 14)
(Feb 14,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 14)
(Feb 14,2012)Announcement of change of director
(Feb 14,2012)Receipt of instruction document from NISA regarding submission request for report on the correspondence for temperature increase in the lower part of the Reactor Pressure Vessel of Unit 2 at TEPCO Fukushima Daiichi Nuclear Power Station.
(Feb 13,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 13)
(Feb 13,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 13)
(Feb 13,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 13, 2012)
(Feb 13,2012)Approval of the amendment of the Special Business Plan
(Feb 13,2012)FY2011 Third Quarter Financial Results (April 1 through December 31, 2011)
(Feb 13,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am February 13)
(Feb 13,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 13)
(Feb 12,2012)Temperature increase of the lower part of the Reactor Pressure Vessel of Unit 2 at Fukushima Daiichi Nuclear Power Station
(Feb 12,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:30 pm, February 12)
(Feb 12,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:30 pm, February 12)
(Feb 12,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 12, 2012)
(Feb 12,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 12)
(Feb 12,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 12)
(Feb 11,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 11)
(Feb 11,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 11)
(Feb 11,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 11, 2012)
(Feb 11,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 11)
(Feb 11,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 11)
(Feb 10,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 10)
(Feb 10,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 10)
(Feb 10,2012)Submission of a report regarding thoroughgoing and enhancement of fire countermeasure at Fukushima-daiichi and Fukushima-daini Nuclear Power Station
(Feb 10,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 11:00 am, February 10)
(Feb 10,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 11:00 am, February 10)
(Feb 10,2012)Reporting to NISA regarding the action for water leakage from near the emergency reactor injection pump on the hill etc of Fukushima Daiichi Nuclear Power Station
(Feb 10,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 10, 2012)
(Feb 9,2012)TEPCO Concludes Communication Response Measures Agreement with Niigata Municpalities
(Feb 9,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 9)
(Feb 9,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 9)
(Feb 9,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 9)
(Feb 9,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 9)
(Feb 9,2012)Upgrade of gas turbine facilities to combined cycle system owned by Kashima Thermal Power Station - Securing further electricity supply and reducing environmental impact -
(Feb 9,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 9, 2012)
(Feb 9,2012)Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of February 9)
(Feb 8,2012)Report to NISA on the investigation result of the outdoor storage tank regarding the event of water or radioactive material leakage from concentrated water storage tank of water desalinations in Fukushima Daiichi Nuclear Power Station
(Feb 8,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 8)
(Feb 8,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 8)
(Feb 8,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 8, 2012)
(Feb 8,2012)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station(33rd Release)
(Feb 8,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 8)
(Feb 8,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 8)
(Feb 7,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 7)
(Feb 7,2012)Regarding start of reparation payouts for vehicles in the "no-go zone"
(Feb 7,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 7)
(Feb 7,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 7)
(Feb 7,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 7)
(Feb 7,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 7, 2012)
(Feb 7,2012)Shutdown of the Stage 1 of the Group 4 of Futtsu Thermal Power Plant
(Feb 6,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 6)
(Feb 6,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 6)
(Feb 6,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 6)
(Feb 6,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 6)
(Feb 6,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 6, 2012)
(Feb 5,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 5)
(Feb 5,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 5)
(Feb 5,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 5, 2012)
(Feb 5,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 5)
(Feb 5,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 5)
(Feb 4,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 5:00 pm, February 4)
(Feb 4,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 5:00 pm, February 4)
(Feb 4,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 11:00 am, February 4)
(Feb 4,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 11:00 am, February 4)
(Feb 4,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 4, 2012)
(Feb 4,2012)Receipt of instruction documents regarding thoroughgoing and enhancement of fire countermeasure at Fukushima-daiichi and Fukushima-daini Nuclear Power Station
(Feb 4,2012)Receipt of directive document regarding finding accumulated water at concentrated water storage tank of water desalinations (Reverse Osmosis Membrane)in Fukushima Daiichi Nuclear Power Station
(Feb 3,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 3)
(Feb 3,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 3)
(Feb 3,2012)Application for Changing the Special Business Plan
(Feb 3,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 3, 2012)
(Feb 3,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 3)
(Feb 3,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 3)
(Feb 3,2012)Power Supply to the Kyushu Electric Power Company
(Feb 2,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 4:00 pm, February 2)
(Feb 2,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 4:00 pm, February 2)
(Feb 2,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 2, 2012)
(Feb 2,2012)Status of the Inspection and Restoration Works Performed after the Niigata-Chuetsu-Oki Earthquake (as of February 2)
(Feb 2,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 2)
(Feb 2,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 2)
(Feb 1,2012)Commencement of demonstration test of "Smart Setsuden (Power Saving)"- Starting from February by "Smart Setsuden (Power Saving) Association" -
(Feb 1,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 3:00 pm, February 1)
(Feb 1,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 3:00 pm, February 1)
(Feb 1,2012)Incorrect Data in the Report of Results of Comprehensive Evaluation (Primary Evaluation) regarding Safety on Unit 1 and Unit 7 of Kashiwazaki-Kariwa Nuclear Power Station to NISA
(Feb 1,2012)Situation of storing and treatment of accumulated water including highly concentrated radioactive materials at Fukushima Daiichi Nuclear Power Station (32nd Release)
(Feb 1,2012)Plant Status of Fukushima Daiichi Nuclear Power Station (as of 10:00 am, February 1)
(Feb 1,2012)Plant Status of Fukushima Daini Nuclear Power Station (February 1, 2012)
(Feb 1,2012)Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 10:00 am, February 1)