search


Top > Releases ・ Announcements > Fukushima Daiichi NPS Prompt Report > 2013 > Water Leak from the Underground Reservoir No.2 in Fukushima Daiichi Nuclear Power Station (Follow-up Information)

Fukushima Daiichi NPS Prompt Report 2013

Fukushima Daiichi NPS Prompt Report (Apr 06, 2013)Water Leak from the Underground Reservoir No.2 in Fukushima Daiichi Nuclear Power Station (Follow-up Information)

This is follow-up information regarding the water leak from the underground reservoir No. 2 in Fukushima Daiichi NPS.

We are planning to transfer the water in the underground reservoir No.2 to the underground reservoir No.1 soon after it is ready.

Approximately 13,000 m3 (operational limit) of water is accumulated in the underground reservoir No.2 (Capacity: approximately 14,000 m3) and approximately 11,500 m3 (operational limit) of the water will be transferred to the underground reservoir No.1 (Capacity: approximately 13,000 m3).

We assume that there is no leakage to the ocean since there is no drainage ditch near the reservoir.


to TOP