search


Top > Releases ・ Announcements > Fukushima Daiichi NPS Prompt Report > 2013 > Water Leak from the Underground Reservoirs in Fukushima Daiichi Nuclear Power Station (Follow-up Information No.200)

Fukushima Daiichi NPS Prompt Report 2013

Fukushima Daiichi NPS Prompt Report (Jun 05, 2013)Water Leak from the Underground Reservoirs in Fukushima Daiichi Nuclear Power Station (Follow-up Information No.200)

This is follow-up information regarding the water leak from the underground reservoirs at Fukushima Daiichi NPS.

The results of chloride concentration analysis performed in the drain holes of the underground reservoirs No.1-7 (14 locations) and the leakage detection holes of the underground reservoirs No.1-4 and 6 (sample could not be collected at 2 out of 10 locations) today (June 5) are as follows.

No significant change was found with the chloride concentration analysis results compared to yesterday (June 4).

The water level, etc. of the underground reservoirs will continue to be intensively monitored.

[Chloride concentration analysis results on June 5]

- Drain hole (northeast) of the underground reservoir No.1
Sampling performed at 8:51 AM on June 5
Chloride concentration: 12ppm

- Drain hole (southwest) of the underground reservoir No.1
Sampling performed at 8:54 AM on June 5
Chloride concentration: 7ppm

- Drain hole (northeast) of the underground reservoir No.2
Sampling performed at 8:42 AM on June 5
Chloride concentration: 11ppm

- Drain hole (southwest) of the underground reservoir No.2
Sampling performed at 8:47 AM on June 5
Chloride concentration: 7ppm

- Drain hole (northeast) of the underground reservoir No.3
Sampling performed at 8:33 AM on June 5
Chloride concentration: 9ppm

- Drain hole (southwest) of the underground reservoir No.3
Sampling performed at 8:39 AM on June 5
Chloride concentration: 4ppm

- Drain hole (northeast) of the underground reservoir No.4
Sampling performed at 8:34 AM on June 5
Chloride concentration: 12ppm

- Drain hole (southwest) of the underground reservoir No.4
Sampling performed at 8:45 AM on June 5
Chloride concentration: 9ppm

- Drain hole (northeast) of the underground reservoir No.5
Sampling performed at 8:35 AM on June 5
Chloride concentration: 9ppm

- Drain hole (southwest) of the underground reservoir No.5
Sampling performed at 8:27 AM on June 5
Chloride concentration: 9ppm

- Drain hole (northeast) of the underground reservoir No.6
Sampling performed at 9:03 AM on June 5
Chloride concentration: 11ppm

- Drain hole (southwest) of the underground reservoir No.6
Sampling performed at 8:44 AM on June 5
Chloride concentration: 10ppm

- Drain hole (northeast) of the underground reservoir No.7
Sampling performed at 9:12 AM on June 5
Chloride concentration: 5ppm

- Drain hole (southwest) of the underground reservoir No.7
Sampling performed at 9:21 AM on June 5
Chloride concentration: 8ppm

- Leakage detection hole (northeast) of the underground reservoir No.1
Sampling performed at 8:12 AM on June 5
Chloride concentration: 18ppm

- Leakage detection hole (southwest) of the underground reservoir No.1
Sampling performed at 8:20 AM on June 5
Chloride concentration: 6ppm

- Leakage detection hole (northeast) of the underground reservoir No.2
Sampling performed at 8:19 AM on June 5
Chloride concentration: 11ppm

- Leakage detection hole (southwest) of the underground reservoir No.2
Sampling performed at 8:27 AM on June 5
Chloride concentration: 11ppm

- Leakage detection hole (northeast) of the underground reservoir No.3
Sampling performed at 8:27 AM on June 5
Chloride concentration: 9ppm

- Leakage detection hole (southwest) of the underground reservoir No.3
Sampling performed at 8:34AM on June 5
Chloride concentration: 9ppm

- Leakage detection hole (northeast) of the underground reservoir No.4
Sampling performed at 8:27 AM on June 5
Chloride concentration: 9ppm

- Leakage detection hole (southwest) of the underground reservoir No.4
*Sampling was not performed since the amount of sample necessary for analysis could not be obtained.

- Leakage detection hole (northeast) of the underground reservoir No.6
Sampling performed at 8:53 AM on June 5
Chloride concentration: 5ppm

- Leakage detection hole (southwest) of the underground reservoir No.6
*Sampling was not performed since the amount of sample necessary for analysis could not be obtained.


to TOP