This is follow-up information on the "water leak at a tank in the H4 area in Fukushima Daiichi Nuclear Power Station" found on August 19.

At 9:55 PM yesterday (on August 20), we started transferring water stored in the tank No.5 in the group I in the H4 area into the tank No.10 in the group B in the H4 area. At 9:13 PM today (on August 21), we completed the transfer.

We patrolled the site to check on conditions after the transfer, and found no abnormality such as leakage.

With regards to the water accumulated inside the dike, we are continuing to shift the water into a temporary tank, etc.