Design basis target facility(prevention of major accidents)

Requirements from the New Regulatory Requirements
●Safety functions should not be impaired by the impact of tornadoes.
Actions taken at the Kashiwazaki-Kariwa Nuclear Power Station
●The maximum wind speed of a tornado for design was revised from the standard setting of 76 meters per second to 92 meters per second,
 in consideration of future climate changes.
●Protective measures are being implemented for equipment (reactor building openings, outdoor equipment, etc.)
 that from a design viewpoint will likely be affected by a tornado.

TEPCO

18Impact assessments of tornadoes and countermeasures Design basis target facility(prevention of major accidents)

Requirements from the New Regulatory Requirements
●Safety functions should not be impaired by the impact of tornadoes.
Actions taken at the Kashiwazaki-Kariwa Nuclear Power Station
●The maximum wind speed of a tornado for design was revised from the standard setting of 76 meters per second to 92 meters per second, in consideration of future climate changes.
●Protective measures are being implemented for equipment (reactor building openings, outdoor equipment, etc.) that from a design viewpoint will likely be affected by a tornado.