Parameters related to the plants at Fukushima Daiichi Nuclear Power Station

Real-time data

Major monitoring parameters can be checked as the amounts of Units 1-3 core injection water are reduced.
- Temperature at the RPV bottom, Amounts of water injected into reactor >>> Refer to "Temperature in the RPV"
- Temperature in the PVC, Amounts of water injection into reactor >>> Refer to "Temperature in the PCV"

The newest data

Parameters related to the plants at Fukushima Daiichi Nuclear Power Station

Data (Every hour, Every 6 hour) [CSV]

[Reference] Location of water gauges installed in the Primary Containment VesselsPDF (updated on December 25, 2018)

Major monitoring parameters can be found in following categories as the amounts of Units 1-3 core injection water are reduced.
- Temperatures at the bottom of Reactor Pressure Vessels and temperatures of Primary Containment Vessels >>> Parameters related to temperature (Graph)
- Amounts of water injected into Reactor Cores and dust monitors for the nitrogen gas injection systems in Primary Containment Vessels >>> Data every hour (CSV), Data every 6 hours (CSV)
- Other parameters (temperatures at the upper part of Reactor Pressure Vessels, pressure inside Primary Containment Vessels, water levels inside Primary Containment Vessels) >>> Data every 6 hours (CSV)

Announcement
- Data may be missing due to regular inspections of the facilities.
- Water vapor (mist) might be produced in the upper part of the reactor buildings, depending on outside temperatures and humidity.

* Only Japanese for holidays and weekends

Archives

Change history etc.

December 10, 2019
The following changes were made to Every 6 hour Data [CSV] for Unit 2:
・"The oxygen concentration of nitrogen gas separation apparatus (A)” was changed to "The nitrogen concentration of nitrogen gas separation apparatus (A)”.
・"The oxygen concentration of nitrogen gas separation apparatus (B)” was changed to "The nitrogen concentration of nitrogen gas separation apparatus (B)”.
・"The oxygen concentration of nitrogen gas separation apparatus (C)” was changed to "The nitrogen concentration of nitrogen gas separation apparatus (C)”.
November 13, 2019
Regarding the Every 6 hour Data [CSV] for Units 1 - 3, the number of decimal places for expressing the figures of the following items was changed to three.
- Every 6 hour Data [CSV] for Unit 1
・Pressure of building inlet nitrogen gas injection
・Secondary Pressure of nitrogen gas injection to RPV(A)
- Every 6 hour Data [CSV] for Unit 2
・Primary Pressure of nitrogen gas injection to RPV(A)
- Every 6 hour Data [CSV] for Unit 3
・Pressure of building inlet nitrogen gas injection
・Secondary Pressure of nitrogen gas injection to RPV(A)
November 9, 2019
With the installation of an additional nitrogen injection line at Unit 3, the following changes were made;
- Fukushima Daiichi Nuclear Power Station Plant Parameters (accessible by clicking "The newest data" below "Parameters related to the plants at Fukushima Daiichi Nuclear Power Station")
・Regarding the "Flow rate of nitrogen gas injection to Reactors" for Unit 3, "RPV" was changed to "RPV-A" and data monitoring for "RPV-B" started.
- Every 6 hour Data [CSV] for Unit 3
・"Flow rate of nitrogen gas injection to RPV" was changed to "Flow rate of nitrogen gas injection to RPV(A)".
・"Pressure of nitrogen gas injection to RPV" was changed to "Primary Pressure of nitrogen gas injection to RPV(A)".
・"Pressure of nitrogen gas injection" was changed to "Pressure of building inlet nitrogen gas injection". Additionally the unit was changed from kPa to MPa.
・Data monitoring for Flow rate of nitrogen gas injection to RPV(B), Secondary Pressure of nitrogen gas injection to RPV(A), Primary Pressure of nitrogen gas injection to RPV(B) and Secondary Pressure of nitrogen gas injection to RPV(B) started.
October 5, 2019
With the installation of an additional nitrogen injection line at Unit 2, the following changes were made;
- Fukushima Daiichi Nuclear Power Station Plant Parameters (accessible by clicking "Newest data" below "Parameters related to the plants at Fukushima Daiichi Nuclear Power Station")
・Regarding the "Flow rate of nitrogen gas injection to Reactors" for Unit 2, "RPV" was changed to "RPV-A" and data monitoring for "RPV-B" started.
- Every 6 hour Data [CSV] for Unit 2
・"Flow rate of nitrogen gas injection to RPV" was changed to "Flow rate of nitrogen gas injection to RPV(A)".
・"Pressure of nitrogen gas injection to RPV" was changed to "Primary Pressure of nitrogen gas injection to RPV(A)".
・"Pressure of nitrogen gas injection" was changed to "Pressure of building inlet nitrogen gas injection". Additionally the unit was changed from kPa to MPa.
・Data monitoring for Flow rate of nitrogen gas injection to RPV(B), Secondary Pressure of nitrogen gas injection to RPV(A), Primary Pressure of nitrogen gas injection to RPV(B) and Secondary Pressure of nitrogen gas injection to RPV(B) started.
August 6, 2019
With the installation of an additional nitrogen injection line at Unit 1, the following changes were made;
- Fukushima Daiichi Nuclear Power Station Plant Parameters (accessible by clicking "Newest data" below "Parameters related to the plants at Fukushima Daiichi Nuclear Power Station")
・Regarding the "Flow rate of nitrogen gas injection to Reactors" for Unit 1, "RVH" was changed to "RVH-A" and data monitoring for "RVH-B" started.
- Every 6 hour Data {CSV} for Unit 1
・"Flow rate of nitrogen gas injection to RPV" was changed to "Flow rate of nitrogen gas injection to RPV(A)".
・"Pressure of nitrogen gas injection to RPV" was changed to "Primary Pressure of nitrogen gas injection to RPV(A)"
・Data monitoring for Flow rate of nitrogen gas injection to RPV(B), Secondary Pressure of nitrogen gas injection to RPV(A), Primary Pressure of nitrogen gas injection to RPV(B) and Secondary Pressure of nitrogen gas injection to RPV(B) started.
December 25, 2018
"Location of water gauges installed in the Primary Containment Vessels" were updated.
May 14, 2018
Following items ended their listing:
- summary table for parameters related to the plants as of 5:00am
- charts for parameters related to the temparature
March 26, 2018
Following data were added to the Unit 2 data set obtained every 6 hours (csv): The oxygen concentration of nitrogen gas separation apparatus (A) and The oxygen concentration of nitrogen gas separation apparatus (B) and The oxygen concentration of nitrogen gas separation apparatus (C).
December 1, 2017
Temperatures at 3 points (TE-2-3-69L1, TE-2-3-69L2 and TE-2-3-69L3) in the Bottom Head section of the Unit 3 Reactor Pressure Vessel (RPV)were excluded from planned data monitoring.
Accordingly, "The most recent measuring instrument status based on data obtained every hour and every 6 hours (CSV)" and the "Temperature measurement points (Figure)" have been updated.
October 23, 2017
"The latest statuses of measurement instruments according to the data obtained every hour and every 6 hours (CSV)"was updated.
August 30, 2017
Unit 3 PCV temperature gauges (TE-16-002,TE-16-004) were selected as monitoring equipment.
Data sampling started on August 30, 2017.
Accordingly, "Temperature measurement point maps" have been updated.
July 19, 2017
Nitrogen gas injection into Unit 1 RPV started using the jet pump instrumentation rack line.
Accordingly, data recording of the flow rate and the pressure on this line has been started in addition to the existing line.
July 10, 2017
Data recording of Unit3 PCV temperatures (TE-16-002,TE-16-004) were excluded as the monitoring objects.
Accordingly, "Temperature measurement points map" has been updated.
May 12, 2017
Data recording of PCV temperatures (TE-1625T5, TE-1625T7) started on May 12 because they were selected as the monitoring objects.
Accordingly, "Temperature measurement point maps" have been updated.
"Location of water gauges installed in the Primary Containment Vessels"has been updated due to the reinstallation of water gauges.
March 30, 2017
Real- time data of "Temperature at the RPV lowest point","Temperature in the PCV", "Amounts of water injection into the reactor", "Radioactive material concentration in the PCV" and "Hydrogen concentration in the PCV" were newly released.
March 2, 2017
Unit 1 PCV temperature gauges (TE-1625T3, TE-1625T6) have been missing since March 2, 2017 because they were excluded from the monitoring thermometer under the implementation plan.
January 25, 2017
As operations to reduce core injection water into Unit 1 (Step 3) began, new data were added to "Temperatures in the Primary Containment Vessels when the amounts of core injection water are reduced (data obtained for 24 hours after the operation)."
January 5, 2017
As operations to reduce core injection water into Unit 1 (Step 2) began, new data were added to "Temperatures in the Primary Containment Vessels when the amounts of core injection water are reduced (data obtained for 24 hours after the operation)."
December 15, 2016
As operations to reduce core injection water into Unit 1 began, information about the “Temperatures in the Primary Containment Vessels when the amounts of core injection water are reduced (data obtained for 24 hours after the operation)” was also added to the page.
December 14, 2016
Data of water levels inside Unit 1 PCV were newly added to the data set obtained every 6 hours (CSV).
Data of water levels inside Unit 2 PCV were newly added to the data set obtained every 6 hours (CSV).
Data of water levels inside Unit 3 PCV were newly added to the data set obtained every 6 hours (CSV).
Along with the additional data, information about the “Location of water gauges installed in the Primary Containment Vessels” was posted on the page.
December 1, 2016
Following data were added to the Unit 1 data set obtained every 6 hours (csv): airborne radioactive concentrations (dust and long half-life noble gas) and surface radiation of filter units at the nitrogen gas injection system to Unit 1 PCV and an area monitor of the Units 1-2 central control room.
Following data were added to the Unit 2 data set obtained every 6 hours (csv): airborne radioactive concentrations (dust and long half-life noble gas) and surface radiation of filter units at the nitrogen gas injection system to Unit 2 PCV and dust concentrations in the exhaust gas from the Unit 2 reactor building.
Following data were added to the Units 3-4 data set obtained every 6 hours (csv): airborne radioactive concentrations (dust and long half-life noble gas) and surface radiation of filter units at the nitrogen gas injection system to Unit 3 PCV, No. 31 area monitor of the Units 3-4 central control room, and dust radiation monitor Channel A at the exhaust system for Unit 4 fuel removal cover.
"The latest statuses of measurement instruments according to the data obtained every hour and every 6 hours (CSV)" were updated.
January 27, 2016
Data sampling at Unit 2 SUPPLY AIR D/W COOLER HVH2-16C (TE-16-114H#1) and SUPPLY AIR D/W COOLER HVH2-16E (TE-16-114K#1) stopped because they were excluded from the reference thermometers.
Data sampling at Unit 2 SUPPLY AIR D/W COOLER HVH2-16C (TE-16-114H#2) and SUPPLY AIR D/W COOLER HVH2-16E (TE-16-114K#2) started because they were selected as the monitored thermometers.
Data sampling at Unit 3 PCV thermometer (TE-16-002) and PCV thermometer (TE-16-004) started because they were selected as the monitored thermometers.
For the above reasons, “The latest statuses of measurement instruments according to the data obtained every hour and every 6 hours (CSV)” and the “Measuring points of temperature (Figure)” were updated.
June 4, 2015
Unit 1 PCV temperature gauges (TE-1625T3,T1625T6) were selected as monitoring equipment.
Data sampling started on June 4, 2015.
Accordingly, "Temperature measurement point maps" have been updated.
April 23, 2015
Unit 2 RPV temperature (TE-2-3-69R) was selected as monitoring temperature.
Data sampling started on April 23, 2015.
Accordingly, "temperature measurement point (figures)" and "latest status of the indicators in hourly/every six hours data (CSV)" have been updated.
April 7, 2015
The measurement values of Unit 1 PCV temperature (TE-1625T3,TE-1625T6) were excluded from the monitoring thermometer; therefore, we have updated "temperature measurement points (figures)."
Unit 1 Primary containment vessel's pressure indicator PT-1601-69 has been replaced to monitoring subsidiary indicator. From April 7th, 2015, midnight, on a 6 hourly data (CSV) primary containment vessel's pressure indicator PT-1632C was changed to PT-1601-69 and has been started the data samplings. Therefore, we have been updated the "latest status of indicators."
March 4, 2015
Unit has been changed from MPa to kPa due to the change in pressure gauge at Unit 2 Reactor Pressure Vessel, after the trend of reading was evaluated to be inappropriate for monitoring.
July 17, 2014
The "Measuring points of temperature (Figure)" has been updated due to the restoration of the monitoring thermometer at the points inside Unit 2 PCV (TE-16-007,TE-16-008).
May 17, 2014
From 23:00 on May 16, 2014, obtaining data from the reactor pressure vessel pressure gauge (PT-1632C) has been started, instead of primary containment vessel pressure gauge (PT-1601-69) at Unit 1 for the every 6 hour data (CSV). The primary containment vessel pressure gauge (PT-1601-69) has been excluded from the monitoring backup equipment.
"The latest statuses of measurement instruments according to the data obtained every hour and every 6 hours" has been updated due to this change.
May 15, 2014
"Measuring points of temperature (Figure)" has been updated, since Unit 2 PCV temperature (TE-16-007,TE-16-008) is no longer a monitoring object specified by the Implementation Plan.
Apr 9, 2014
April 9.2014 "Measuring points of temperature (Figure)" and "the latest statuses of measurement instruments according to the data obtained every 6 hours (CSV)" were updated, since Unit 1 PCV temperature (TE-1625T3) has become a monitoring object specified by the Implementation Plan.
Apr 4, 2014
"Measuring points of temperature (Figure)" and "the latest statuses of measurement instruments according to the data obtained every 6 hours (CSV)" has updated, since Unit 1 PCV temperature (TE-1625T3) is no longer a monitoring object specified by the Implementation Plan.
Feb 20, 2014
The temperature of RPV of Unit 2 (TE-2-3-69R) excluded from instruments to be monitored under the operational safety regulation. 'The temperature measurement points (figure)' and 'the latest situation of the gauge in the data obtained every hour/six hours (CSV)' was updated accordingly.
Oct 2, 2013
Since a thermormeter was additionally installed inside the Unit 2 PCV, data recording of Unit 2 PCV temperature (TE-16-007 and TE-16-008) provided in "Data (Every 6 hour) CSV" was started at 5:00 AM on October 2, 2013. In addition, "Parameters related to temperature (Graph)" and "Measuring points of temperature (Figure)" was renewed.
We have corrected the name of the instrument (TE-2-3-69F1, TE-2-3-69F2 and TE-2-3-69F3) provided in "Data (Every 6 hour) CSV" and "Measuring points of temperature (Figure)" at Unit 2.
Since Unit 6 reactor was opened, data recording of Unit 6 reactor water level provided in "Data (Every hour) CSV" was started by using the "reactor water level open vessel" at 4:00 PM on September 20, 2013. In addition, "Stoppage range of reactor water level" has no longer been displayed (left as blank) since 4:00 PM on September 20, 2013.
Apr 9, 2013
After 5:00 AM on April 9, 2013, the data obtained by an alternative instrument RPV BELLOWS SEAL AREA(TE-16-114N#1) replacing Unit 2 RPV BELLOWS SEAL AREA (TE-16-114R#2) has been provided in the data obtained every 6 hours (CSV).
Mar 4, 2013
After 0:00 AM on March 4, 2013, the data of instruments judged to be "failed" included in the data obtained every hour/six hours (CSV) is no longer displayed (left as blank) as they are no longer used for evaluation and their reliability is low.
As for the data of Unit 2 SUPPORT SKIRT TOP (TE-2-3-69K1) included in the data obtained every six hours (CSV), the data of the alternative Unit 2 SUPPORT SKIRT TOP (TE-2-3-69K2) is provided instead after 5:00 AM on March 4, 2013.
The data of the PCV temperatures (TE-16-114W#1), (TE-16-114W#2)on March 4, 2013 are not displayed (left as blanks) in the data obtained every 6 hours (CSV) acquired at 11:00 AM on March 4 and later since the instruments were removed for the investigation of the inside of the PCV and permanent thermometer installation. The temperature measurement points (figure) have been updated accordingly.
Feb 18, 2013
As for the parameters related to Unit 1 water level, pressure and temperature obtained every hour (CSV), the data on reactor injection water flow rate (CS) as of 12:00 AM(Midnight) on January 23, 2012 has been corrected.
Jan 17, 2013
A document on the latest statuses of measurement instruments has been added (with the format of data obtained every hour and every 6 hours (CSV) changed).
Dec 4, 2012
The format of Unit 1 data obtained every 6 hours (csv) has been changed (click here for examples) and the temperature measurement points (figure) have been updated.
Nov 20, 2012
The data acquired at 1:35 and 12:25 on March 16, 2011 has been added to Unit 2 Parameters Related to Water Level and Pressure (CSV, graph)
Nov 14, 2012
The year in the "Parameters related to temperature" (CSV) for Units 1-3 in the 2011, 2012 archive has been corrected from 2012 to 2011.
Nov 8, 2012
Unit 3 spent fuel pool water temperature and FPC skimmer surge tank water level as of 11:00 on November 7 on the Parameters Related to Plants (overview chart) have been corrected to match the note.
Nov 6, 2012
Format being changed and measuring points of temperature (Figure)
Nov 5, 2012
According to the data additions and corrections made to the past parameters related to the plants, the water level, pressure, temperature data of March 2011 was updated and the amounts of water injection into Units 1-3 reactors and the complementary document on the fire fighting pump flowmeter reading data (posted on June 13, 2011) have been replaced.(Go here for details on the changes made)
Sep 8, 2012
Thermometers of safety regulations of Unit2 has been deleted since it was excluded from instruments to be monitored under the Safety Regulation.
Aug 14, 2012
Format being changed since the data of 11:00 am, August 14, 2012.
Jul 12, 2012
Format being changed since the data of 5:00 am, July 12, 2012.
May 28, 2012
Data was corrected as we found that the wiring for the digital recorder of Unit 1 safety valve thermometer was done incorrectly.
Mar 16, 2012
Format being changed since the data of 11:00 am, March 16, 2012. (For the data before 6:00 am on Mar.16, 2012)
Jan 19, 2012
Regarding the temperature data of Unit 1 as of 12:00 PM, January 18, the data table value on PDF page 3 was incorrect (we had uploaded the temperature data of Unit 2) from 3:00 PM, January 18 to 9:40 AM, January 19.
Nov 29, 2011
Incorrect data for pressure at Primary Containment Vessel of Unit 1 at Fukushima Daiichi Nuclear Power Station (Brief Overview)
Nov 11, 2011
Correction of pressure data of plant parameters in primary containment vessel D/W of Unit 2 in Fukushima Daiichi Nuclear Power Station
Jun 13, 2011
Correction of parameters related to the plants in Fukushima Daiichi Nuclear Power Station

[Press Release] Correction of parameters related to the plants in Fukushima Daiichi Nuclear Power Station[June 13, 2011]