search



Corporate Information

 
Press Release (May 13,2011)
Status of TEPCO's Facilities and its services after the Tohoku-Chihou-Taiheiyou-Oki Earthquake (as of 9:00 AM, May 13)
 
Due to the Tohoku-Chihou-Taiheiyou-Oki Earthquake which occurred on March
11th 2011, TEPCO's facilities including our nuclear power stations have
been severely damaged. We deeply apologize for the anxiety and
inconvenience caused.
With regard to the accident at Fukushima Daiichi Nuclear Power Station, on
April 17th, we have put together the roadmap towards restoration from the
accident. By bringing the reactors and spent fuel pools to a stable
cooling condition and mitigating the release of radioactive materials, we
will make every effort to enable evacuees to return to their homes and for
all citizens to be able to secure a sound life.

Below is the status of TEPCO's major facilities.
*Updates from previous press release are underlined.
[Nuclear Power Station]
Fukushima Daiichi Nuclear Power Station: 
       Units 1 to 3: shutdown due to the earthquake
       (Units 4 to 6: outage due to regular inspections) 
-At 4:53 pm on May 12th, as a part of work to switch the water injection 
 line to the nuclear reactor of Unit 3 from the fire extinction system 
 piping arrangement to the reactor feed water system piping arrangement, 
 we started water injection through the reactor feed water system piping 
 arrangement at approximately 3 m3/h in addition to the fire extinction 
 system piping arrangement at approximately 9 m3/h. 
 
-At 10:00am on May 12th, we restarted transferring accumulated water on
 the basement in the turbine building of Unit 6 to the Radiation Waste
 Treatment Building. At 4:00pm on the same day, we stopped the pumps for
 the transfer (approximately 120 m3).
Fukushima Daini Nuclear Power Station: 
       Units 1 to 4: shutdown due to the earthquake
Kashiwazaki Kariwa Nuclear Power Station: 
       Units 1, 5, 6, 7: normal operation 
       (Units 2 to 4: outage due to regular inspection)
[Thermal Power Station] 
-Hirono Thermal Power Station Unit 2 and 4: Shutdown due to the earthquake
-Hitachinaka Thermal Power Station Unit 1: Shutdown due to the earthquake
[Hydro Power Station] 
-Power supply has returned to normal and facilities damaged by the
 earthquake are now being handled in a timely manner.
[Impacts on Transmission Facilities] 
-Power supply has returned to normal and facilities damaged by the
 earthquake are now being handled in a timely manner.
[Avoidance of further Implementation on Planned Rolling Blackouts and
Request for Conserving Electricity Consumption] 
Currently, we are working to restore electricity supply after our nuclear
and thermal power facilities were severely damaged by
Tohoku-Chihou-Taiheiyou-Oki Earthquake. The widespread understanding and
cooperation of our customers to conserve electricity have contributed to
the improvement of this tight power supply-demand balance situation.
Amidst this backdrop, since the electricity supply will be able to balance
with the demand for the time being, we have decided not to implement
further rolling blackouts in principle.
However, we sincerely ask for your continued cooperation in reducing
electricity consumption due to the possible increase in demand caused by
warmer weather or unexpected trouble at power stations that are currently
being restored to service. In case the electricity supply-demand balance
becomes tighter than expected, we may regrettably need to restart the
implementation of rolling blackouts, with prior notice. We kindly ask for
your cooperation.
We will do our best to maintain this policy of avoiding further
implementation of rolling blackouts during the summer. 
Appendix: Past Progress (PDF 125KB) 
 
* Revised past progress 
back to page top


to TOP