search


Top > Releases ・ Announcements > Fukushima Daiichi NPS Prompt Report > 2013 > Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Follow-up Information 49)

Fukushima Daiichi NPS Prompt Report 2013

Fukushima Daiichi NPS Prompt Report (Sep 24, 2013)Water Leak at a Tank in the H4 area in Fukushima Daiichi Nuclear Power Station (Follow-up Information 49)

This is follow-up information on the "water leak at a tank in the H4 area in Fukushima Daiichi Nuclear Power Station" found on August 19.

The measurement result of all β in a sample newly obtained from the observation hole (E-5) around H4 tank area on September 24 was 100Bq/L.
* The observation hole E-5 is located on the south of the observation hole E-4.

<Observation hole E-5 (new)>
- Sampled on September 24
All β: 100Bq/L
The measurement result of all β obtained at E-1, E-2, E-3 and E-4 on September 24 had no significant change, compared to the measurement result obtained on September 23.

Based on the possibility of influence on these results by leakage in H4 area tanks and leakage from the concentrated salt water transportation pipe treated with desalination apparatus (reverse osmosis membrane type) on March 26 and April 5 in 2012, we will continue to monitor the situation.

For the past sampling results, please refer to the following page on our website:
http://www.tepco.co.jp/en/nu/fukushima-np/f1/smp/index-e.html


to TOP