FUKUSHIMA
DAIICHI
GMT+9:00
DAIICHI
GMT+9:00
-
Basic policies to treat and dispose of radioactive waste
-
Fuel removal from
Units 1 to 2 SFPs -
Confirmed method
to remove fuel debris -
Treatment complete of
contaminated water
inside buildings -
Determining method to
treat and store spent fuel -
Start of fuel debris removal
-
Completion of
fuel debris removal -
Completion of decommissioning
30-40 years later
-
2011
All reactors in cold shutdown -
2012
Start making full-scale measures
against contaminated water -
2013
Struggled in efforts
to deal with issues -
2014
Completion of fuel removal
from Unit 4 spent fuel pool -
2015
Completion of
contaminated water treatment -
2016
Start of full-scale investigation for
fuel debris removal -
2017
Fuel debris removal methods for
each Unit determined -
2018
Prepare for fuel removal from
Units 3 spent fuel pool -
2019
The method employed to retrieve
fuel debris for the first unit will be confirmed -
2020
Dismantling of the Unit 1/2
exhaust stack in cooperation
with a local company -
2021
Completion of fuel removal from
Unit3 spent fuel pool -
2022
In Preparation for Fuel Debris
Retrieval from Unit 2 -
2023
Commencement of the discharge of
ALPS treated water into the sea -
2024
Fuel debris trial retrieval
completed for the first time after the accident -
2025
Toward installing the large
cover at Unit 1 -
2026
Toward fuel removal from
Unit 2 spent fuel pool