1*The "Renewable Energy Power Promotion Surcharge" is calculated based on the "unit price of Renewable Energy Power Promotion Surcharge" set every fiscal year according to provisions; such as the "Act on Purchase of Renewable Energy Sourced Electricity by Electric Utilities", and will be added to the customer's monthly electricity bill.
2* Under the Excess Electricity Purchasing Scheme for photovoltaic power, the total amount TEPCO pays to a residential renewable energy generator will be passed on to all electricity users as a "PV surcharge".
3* The fuel cost adjustment system is designed to meet changes in recent fuel costs, so that electricity rates will be adjusted automatically every month according to certain standards if the cost of fuels, such as crude oil, LNG (liquefied natural gas) or coal, rises or falls due to fluctuations in the foreign exchange rate and energy prices.

Information about Your Electricity Supply Service Contract
A residential customer contract will be classified as Meter-Rate Lighting B or C.
Your present contacted ampere is represented by the color of the ampere breaker.
| Contract ampere | 10A | 15A | 20A | 30A | 40A | 50A | 60A |
|---|---|---|---|---|---|---|---|
| Demand charge | ¥273.00 | ¥409.50 | ¥546.00 | ¥819.00 | ¥1,092.00 | ¥1,365.00 | ¥1,638.00 |
[ How to change your contract ampere ]
To change or increase the present contract ampere, contact your nearest TEPCO customer center and tell them your desired contract ampere. A TEPCO service staff will visit your home on an appointed day and change the ampere breaker. The ampere breaker can be replaced free of charge.
Meter-Rate Lighting C
A contract ampere will be determined according to the volt-ampere of a main circuit breaker installed at a customer's home or the number of branch circuits.
Payment Term
You are requested to pay your electricity bill within 30 days from the day your meter is read. If failure of payment exceeds 50 days, the electricity in your home may be stopped as stated in a prior notice.
Overdue Payment
If failure to pay your electricity bill exceeds your last payment day, we may apply overdue interest to the number of days following the due payment date to the date autual payment is made. The overdue interest shall be the sum determined by multiplying the net charge for payment covered by the calculation of such interest by 10% per annum (for calculation purposes, all years, including leap years, shall be treated as having 365 days).
Rate of Meter-Rate Lighting (Monthly)
Under Meter-Rate Lighting, the energy charge is divided into three blocks so that a higher rate will apply as energy consumption increases.
| Contract category | Unit | Rate,tax included(¥) |
||
|---|---|---|---|---|
| Meter-Rate Lighting B |
Demand charge | 10A | 1 contact | 273.00 |
| 15A | Same as above | 409.00 | ||
| 20A | 546.00 | |||
| 30A | 819.00 | |||
| 40A | 1,092.00 | |||
| 50A | 1,365.00 | |||
| 60A | 1,638.00 | |||
| Energy charge | Up to initial 120kWh (The 1st stage rate) |
1kWh | 18.89 | |
| Larger than 120kWh up to 300kWh (The 2nd stage rate) |
Same as above | 25.19 | ||
| Larger than above (The 3rd stage rate) |
29.10 | |||
| Minimum monthly charge | (per contract) | 224.45 | ||
| Meter-Rate Lighting C |
Demand charge | 1kVA | 273.00 | |
| Energy charge | Up to initial 120kWh (The 1st stage rate) |
1kWh | 18.89 | |
| Larger than 120kWh up to 300kWh (The 2nd stage rate) |
Same as above | 25.19 | ||
| Larger than above (The 3rd stage rate) |
29.10 | |||
[ Other Rate Categories and Electricity Charges ]
Other Contract Categories and Applicable Electricity Rates
Time-Specific Lighting Service "8-Hour Night Service" ("Otokuna Night 8")
Time-Specific Lighting Service "10-Hour Night Service" ("Otokuna Night 10")
A Menu that sets the unit rate by time zones, in which increased electricity usage at night results in reduced electricity rates.
| Contract category | Unit | Rate,tax included(¥) |
|||
|---|---|---|---|---|---|
| 8-Hour Night Service (Time-Specific Lighting) ["8-Hour Night Service"] | Demand charge | Up to 6kVA | 1 contract | 1260.00 | |
| Larger than above | Up to initial 10kVA for 1 contract | 2100.00 | |||
| Per 1kVA above 10kVA | 273.00 | ||||
| Energy charge | Day time | Up to initial 90kWh (The 1st stage rage) | 1kWh | 23.15 | |
| Larger than 90kWh up 230kWh (The 2nd stage rate) | Same as above | 30.87 | |||
| Larger than above (The 3rd stage rate) | Same as above | 35.66 | |||
| Night time | Same as above | 11.82 | |||
| Per 1kVA for 5-hour electric equipment | Discount by 241.50 | ||||
| Per 1kVA for electric controlled night time storage type electric equipment | Discount by 147.00 | ||||
| 10-Hour Night Service (Time-Specific Lighting) ["10-Hour Night Service"] | Demand charge | Up to 6kVA | 1 contract | 1,260.00 | |
| Larger than above | Up to initial 10kVA for 1 contract | 2,100.00 | |||
| Per 1kVA above 10kVA | 273.00 | ||||
| Energy charge | Day time | Up to initial 80kWh (The 1st stage rate) | 1kWh | 25.20 | |
| Larger than 80kWh up to 200kWh (The 2nd stage rate) | Same as above | 33.60 | |||
| Larger than above (The 3rd stage rate) | Same as above | 38.81 | |||
| Night time | Same as above | 12.06 | |||
| Per 1kVA for 8-hour electric equipment | Discount by 42.00 | ||||
| Per 1kVA for 5-hour electric equipment | Discount by 283.50 | ||||
| Per 1kVA for electric controlled night time storage type electric equipment | Discount by 189.00 | ||||
Peak-Controlled-Season-and-Time-Specific Lighting ("Peak Shift Plan")
A Menu that sets seasonal or time zone unit rates, in which the electricity rate is reduced by reducing electricity usage during summer peak time hours or shifting to other time zones.
| Peak Shift Plan (Peak-Controlled -Season-and -Time-Specific Lighting) |
Contract category | Unit | Rate,tax included(¥) |
||
|---|---|---|---|---|---|
| Demand charge |
Up to 6kVA | 1 contract | 1,260.00 | ||
| Larger than above | Up to initiai 10kVA for 1 contract | 2,100.00 | |||
| Per 1kVA above 10kVA | 273.00 | ||||
| Energy charge |
Peak time | 1kWh | 53.16 | ||
| Day time | Same as above | 28.18 | |||
| Night time | Same as above | 11.82 | |||
Season-and time-specific lighting ( "Denka Jozu" )
A recommended menu for customers who have adopted use of the EcoCute or an equivalent system and also use electricity in the kitchen.
| Contract category | Unit | Rate,tax included(¥) |
|||||
|---|---|---|---|---|---|---|---|
| Denka Jozu (Season-and-time-Specific Lighting) |
Demand charge |
Under 6kVA | 1 contract | 1,260.00 | |||
| Larger than above | Up to initial 10kVA for 1 contaract | 2,100.00 | |||||
| Per 1kVA above 10kVA | 273.00 | ||||||
| Energy charge |
Day time | Summer | 1kWh | 37.56 | |||
| Other seasons | Same as above | 30.77 | |||||
| Morning and evening time | Same as above | 25.20 | |||||
| Night time | Same as above | 11.82 | |||||
| Per 1kVA for 5-hour electric equipment | Discount by 241.50 | ||||||
| Per 1kVA for electric controlled night time storage type electric equipment | Discount by 147.00 | ||||||
| 5% discount from metered rate of "Denka Jozu" (excluding Summer day time) for all electric houses | |||||||
Night-Only Service
Recommended menu for customers who have facilities whereby electricity usage is restricted to night time hours such as during electric water heater usage.
| Contract category | Unit | Rate,tax included(¥) |
|
|---|---|---|---|
| Night-Only Service (A) | 1 contract | 1,406.07 | |
| Night-Only Service (B) | Basic rate | 1kW | 315.00 |
| Metered rate | 1kWh | 11.82 | |
| Electric controlled night time storage type electric equipment | Discount by 13% | ||
| Night-Only Service II | Basic rate | 1kW | 210.00 |
| Metered rate | 1kWh | 10.88 | |
Low Voltage Power Service
[ This contract is intended for the use of large electric appliances, such as large coolers. ]
| Contract category | Unit | Rate,tax included(¥) |
||
|---|---|---|---|---|
| Low Voltage Power Service | Demand charge | 1kW | 1,071.00 | |
| Energy charge | Summer | 1kWh | 16.50 | |
| Other Seasons | 1kWh | 14.99 | ||