TEPCO have been improving the existing system and adapting high technical
	  construction method for new project to realize cost reduction. For example,
	  we make plans for reconstruction of aged hydro power plants from economical
	  benefit and make effort to construct of compact substation etc.
	
	Hydro Power
	Transmission Network
	Planning 
	Transmission Network
	Underground Transmission Line
	
	Substation
	
		- Consulting of Compact Substation Design
 
	
	Consulting of Compact Substation Design
	
	1. Merit of compactness 
	
		- Reduction of construction cost
 
		- Reduction of environmental impact
 
		- Creation of new space 
 
		- Smoothly promotion of construction plan 
 
	
	
	2. Compactness design technology of TEPCO
	(1) Downsizing of equipment
	
		- Finding and design concerning insulation performance and cooling performance
		  of equipment
 
		- Achievement of compact by specification rationalization, and the technological
		  experience to set proper margin 
 
	
	
	
		- "Transition of equipment space"
		
		
 
	
	
	(2) Arrangement design rationalization
	
		- Effective arrangement design of auxiliary devices of equipment, and arrangement
		  design examination know-how
 
		- Earthquake-proof design and foundation design
 
		- Civil design, building design, and construction which minimizes substation
		  site area
 
		- Effective hierarchical arrangement design of constructing at narrow-minded
		  site and underground
 
		- Arrangement design that considers operation, maintainability, and adaptability
		  for future expansion
 
	
	
	
	
		- "Example of underground substation" 
		  The equipment and the switchboard are arranged 
		  in the same room.  
	
	
	TEPCO has abundant experiences of substation design of in-door type and underground type
	
	Our Experience
	
	  
		| Title: | 
		Assistance on 500kV Underground Transmission and Substation Technologies | 
	  
	  
		| Client: | 
		Shanghai Municipal Electric Power Company, China | 
	  
	  
		| Term: | 
		September 2005 – March 2007 | 
	  
	  
		| Outline: | 
		Engineering design and technical assistance in order to build 500kV high
		  voltage underground transmission lines and substation, planned in Shanghai
		  new development area by making best use of TEPCO’s abundant experiences
		  in the underground high voltage transmission technologies. | 
	  
	
	