Plant-related Parameters
Plant-related data is made available.
Real-time Data
Temperature of reactor pressure vessel |
Unit 1 | Unit 2 | Unit 3 |
---|---|---|---|
Temperature in primary containment vessel |
Unit 1 | Unit 2 | Unit 3 |
Radiation levels in primary containment vessel |
Unit 1 | Unit 2 | Unit 3 |
Hydrogen concentration in primary containment vessel |
Unit 1 | Unit 2 | Unit 3 |
Main monitoring parameters can be confirmed as water injection flow rate to the reactors is reduced.
- Water injection flow rate to reactor, containment vessel gas control system dust monitor Hourly data (CSV), Six-hourly data (CSV)
- Temperature in containment vessel, water injection flow rate to reactor Temperature in primary containment vessel
Plant Data
Plant-related Parameters
Summary Table | Summary Table |
---|
Hourly/Six-hourly data (CSV)
Hourly | Unit 1 | Unit 2 | Unit 3 | Unit 5,6 |
---|---|---|---|---|
Six-hourly | Unit 1 | Unit 2 | Unit 3,4 |
Main monitoring parameters can be confirmed as water injection flow rate to the reactors is reduced.
- Water injection flow rate to reactor, containment vessel gas control system dust monitor Hourly data (CSV), Six-hourly data (CSV)
- Other monitoring parameters (temperature at upper part of reactor pressure vessel, containment vessel pressure, containment vessel water level) Six-hourly data (CSV)
Notice
- ""Due to modification of Centralization Remote Monitoring System at the Unit 1-4, following changes have been made in Unit 1-4 "six-hourly data (CSV)":
The name of the plant data "Airborne radioactive concentration (dust) at the nitrogen gas injection system to PCV" has been changed to "Airborne radioactive concentration (dust) (A) at the nitrogen gas injection system to PCV".
The name of the plant data "Airborne radioactive concentration (long half-life noble gas) at the nitrogen gas injection system to PCV" has been changed to "Airborne radioactive concentration (long half-life noble gas) (A) at the nitrogen gas injection system to PCV".
Plant data "Airborne radioactive concentration (dust) (B) at the nitrogen gas injection system to PCV" and "Airborne radioactive concentration (long half-life noble gas) (B) at the nitrogen gas injection system to PCV" have been added. - Data on RPV water level of unit 6 (Stoppage range) may be missing due to equipment inspection on September 11.
- Gaps in data may occur due to equipment maintenance inspections, etc.
- Steam (mist) may occur at the upper part of the reactor building due to outside temperature and humidity conditions.